§ 7-62. Preliminary and final inspection.  


Latest version.
  • (a) All plumbing and other piping or tube work must be in place on work to be concealed before the electrical wiring is inspected, and no such wiring shall be considered as complete until all such plumbing or piping is in place.

    (b) Upon making an inspection of any electrical wiring or equipment when the same is found to have been installed in a satisfactory manner, and in accordance with the provisions of this electrical code, the inspector shall place a notice at the service switch or other suitable place stating the electrical work has been inspected and found to be in accordance with the rules as prescribed and the provisions of this article.

    (c) It shall be unlawful to lath, seal or in any manner conceal any electrical wiring or equipment until same has been inspected and the notice posted as herewith required.

    (d) The electrical inspector shall be the judge of the quality of the material and workmanship, according to this article.

(Code 1962, § 8-39)