§ 7-56. Permits.  


Latest version.
  • (a) A permit will be required to do any electrical construction of any character, install any electrical wiring, apparatus or equipment, or make any extensions or changes to existing wiring systems for light, heat or power within or attached to any building, except the repairing of damaged or broken fixtures, apparatus or equipment and the ordinary work necessary for the proper maintenance of same. The life of an electrical permit for any specific job shall not extend beyond a period of twelve (12) months unless otherwise authorized by the building official.

    (b) Permits to do electrical work will be issued only to master or employing electricians.

(Code 1962, §§ 8-31, 8-32)